Testing

Testing is integrated throughout every stage of the Continuous Delivery Model, not a separate phase after development.


Core Concepts

Concept Description
Test Levels L0-L4 taxonomy based on execution environment and scope
Verification Types IV/OV/PV classification for acceptance testing

Quick Reference

Test Levels (L0-L4)

Level Name Environment Scope Dependencies
L0-L1 Unit Tests DevBox/Agent Source/Binary All test doubles/contracts
L2 Emulated System DevBox/Agent Deployable artifacts All test doubles/contracts
L3 In-Situ Vertical PLTE Deployed system (vertical) All test doubles/contracts
HE2E In-Situ Vertical PLTE Deployed system (vertical) Staged external services
L4 Production Testing Production Deployed system (horizontal) Production external services

Verification Types (Stage 5)

Type Question Focus
IV (Installation) Can we deploy it? Infrastructure, configuration
OV (Operational) Does it work? Functional requirements
PV (Performance) Is it fast enough? Response times, throughput

Shift-Left and Shift-Right

  • Shift LEFT (L0-L3): Fast, deterministic tests with test doubles
  • Shift RIGHT (L4): Production validation with real services
  • Avoid: Horizontal pre-production environments (fragile, non-deterministic)

Stage Mapping

Stage Test Levels Time Budget
2-4 (Development) L0-L2 5-30 min
5-6 (Acceptance) L3 1-8 hours
11-12 (Live) L4 Continuous