Release Approval Patterns

Introduction

Release approval is the final decision before production deployment: "Is this code ready for production?" The CD Model supports two fundamentally different approaches to this decision:

Release Approval (RA) Pattern: Human makes the decision (Stage 9 manual approval)

Continuous Deployment (CDe) Pattern: Automation makes the decision (Stage 9 automated approval, human approved at Stage 3)

Both patterns validate the same quality criteria - they differ in who decides, when they decide, and how long it takes.


RA Pattern: Manual Approval

How It Works

Stage 3 (Merge Request): First-level approval

  • Who: Peer reviewer
  • What: Code quality, design, tests adequate
  • NOT approving: Production deployment (that's Stage 9)

Stage 9 (Release Approval): Second-level approval

  • Who: Release manager
  • What: Production readiness, business timing, risk assessment
  • Approving: Production deployment

Process:

  1. Code merged at Stage 3 (peer-approved code quality)
  2. Automated validation in Stages 4-6 (build, test, PLTE)
  3. Exploration in Stage 7 (stakeholder validation)
  4. Stage 8: Release candidate created, documentation prepared
  5. Stage 9: Release manager reviews evidence and approves (MANUAL)
  6. Stage 10: Production deployment proceeds

Timeline: 1-2 weeks from commit to production

Release Manager Role

Responsibilities:

  • Review quality metrics (tests, coverage, performance, security)
  • Review documentation (release notes, runbooks, rollback procedures)
  • Assess business risk (what's the impact if this fails?)
  • Evaluate timing (is now a good time to deploy?)
  • Make go/no-go decision
  • Coordinate with stakeholders

Skills required:

  • Technical understanding (can read metrics, understand risks)
  • Business judgment (balance technical quality with business needs)
  • Risk assessment (identify and mitigate risks)
  • Communication (coordinate with teams, stakeholders)

Decision authority:

  • Can approve (proceed to Stage 10)
  • Can reject (fix issues, return to earlier stage)
  • Can defer (quality acceptable, but timing is bad)

Approval Checklist

## Stage 9 Approval Checklist

### Quality Metrics
- [ ] All tests passing (100%)
- [ ] Code coverage ≥ 80%
- [ ] Zero critical/high bugs
- [ ] Performance regression < 5%
- [ ] Zero critical/high security vulnerabilities

### Documentation
- [ ] Release notes complete and reviewed
- [ ] Deployment runbook complete
- [ ] Rollback procedure documented and tested
- [ ] Risk assessment reviewed
- [ ] Stakeholder sign-offs obtained

### Business Considerations
- [ ] Deployment timing acceptable (not before holiday, not during peak hours)
- [ ] Dependent systems ready (if coordination required)
- [ ] On-call team prepared
- [ ] Customer communication planned (if user-facing changes)

### Decision
- [ ] **APPROVE**: Proceed to Stage 10 (production deployment)
- [ ] **REJECT**: Fix issues (return to Stage X)
- [ ] **DEFER**: Acceptable quality, deploy later (reschedule)

When to Use RA Pattern

Best for:

  • Regulated industries (finance, healthcare, government)
  • High-risk systems (medical devices, aviation, critical infrastructure)
  • Large coordinated releases (multiple systems must update together)
  • Organizations requiring formal approval (compliance, audit)
  • Teams building deployment maturity

Characteristics:

  • Manual approval provides human judgment
  • Business-driven release timing
  • Formal decision-making process
  • Clear accountability (release manager approved)

CDe Pattern: Automated Approval

How It Works

Stage 3 (Merge Request): Combined first and second-level approval

  • Who: Peer reviewer
  • What: Code quality, design, tests adequate, AND production approval
  • Approving: Production deployment (by merging)

Stage 9 (Release Approval): Automated gate

  • Who: Automated system
  • What: Objective quality thresholds
  • Process: If thresholds met, auto-approve (proceed to Stage 10)

Process:

  1. Code merged at Stage 3 (peer-approved for PRODUCTION)
  2. Automated validation in Stages 4-6 (build, test, PLTE)
  3. Exploration in Stage 7 (optional, may be skipped)
  4. Stage 8: Release candidate created automatically
  5. Stage 9: Automated threshold evaluation (SECONDS)
  6. Stage 10: Production deployment proceeds automatically

Timeline: 2-4 hours from commit to production

Automated Gate Evaluation

Pseudocode:

def evaluate_stage_9_approval():
    """Automated Stage 9 approval for CDe pattern"""

    # Check quality thresholds
    if not all_tests_pass():
        return REJECT("Tests failing - cannot proceed")

    if code_coverage < 80:
        return REJECT(f"Coverage {code_coverage}% < 80%")

    if critical_bugs > 0:
        return REJECT(f"{critical_bugs} critical bugs open")

    if high_bugs > 0:
        return REJECT(f"{high_bugs} high bugs open")

    if performance_regression_percent > 5:
        return REJECT(f"Performance regression {performance_regression_percent}%")

    if critical_vulnerabilities > 0:
        return REJECT(f"{critical_vulnerabilities} critical vulnerabilities")

    if not documentation_complete():
        return REJECT("Release documentation incomplete")

    # All criteria met - auto-approve
    log_approval("Automated approval: all quality thresholds met")
    notify_team("Proceeding to Stage 10 deployment")
    return APPROVE

Shift-Left Approval

Key difference: Approval happens at Stage 3, not Stage 9

When peer reviewer approves merge request in CDe pattern, they're saying:

  • ✅ Code quality good
  • ✅ Tests adequate
  • Ready for production deployment

Stage 9 becomes a verification (did we meet criteria?) not a decision (should we deploy?).

Implications:

  • Peer reviewer has more responsibility
  • Team must trust automated testing
  • Quality gates enforce minimum standards (can't be overridden)
  • Feature flags decouple deployment from release

Requirements for CDe Pattern

1. Robust Automated Testing:

  • Comprehensive unit tests (≥80% coverage)
  • Integration tests for service interactions
  • Acceptance tests (IV, OV, PV) in PLTE
  • Performance tests with realistic load
  • Security scans (SAST, DAST, dependency scanning)

2. Feature Flags:

  • Deploy code with features disabled
  • Enable features via flags (Stage 12)
  • Instant disable capability
  • Gradual rollout per feature

3. Comprehensive Monitoring:

  • Application metrics (errors, latency, throughput)
  • Business metrics (conversion, revenue)
  • Automated alerting on threshold breaches
  • Real-time dashboards

4. Automated Rollback:

  • Automated triggers (error rate > 1%, P95 > 500ms)
  • Fast rollback (< 5 minutes)
  • Tested rollback procedures
  • Minimal human intervention

5. Team Culture:

  • Trust in automation
  • Ownership of quality (developers own quality, not QA)
  • Fast feedback loops valued
  • Continuous improvement mindset

When to Use CDe Pattern

Best for:

  • Fast-moving SaaS products
  • Non-regulated industries (or light regulation)
  • Teams with strong automated testing culture
  • Organizations with feature flag infrastructure
  • Independent services (microservices with clear boundaries)

Characteristics:

  • Automation provides consistency
  • Fast feedback (2-4 hours to production)
  • Continuous flow (no batching)
  • Forces quality discipline

Choosing Between Patterns

Decision Framework

Question 1: Are you in a regulated industry?

  • Yes (finance, healthcare, government) → Likely RA pattern
  • No → Consider CDe pattern

Question 2: Do you have robust automated testing?

  • Yes (≥80% coverage, comprehensive acceptance/performance tests) → Consider CDe pattern
  • No → Start with RA pattern, build testing maturity

Question 3: Do you have feature flags?

  • Yes (infrastructure in place, team uses them) → Consider CDe pattern
  • No → RA pattern, or invest in feature flags

Question 4: What's your deployment frequency?

  • Multiple times per day desired → CDe pattern
  • Weekly/monthly acceptable → RA pattern

Question 5: What's your team's risk tolerance?

  • High (trust automation, willing to learn from production issues) → CDe pattern
  • Low (prefer human oversight, avoid production issues) → RA pattern

Pattern Comparison

Factor RA Pattern CDe Pattern
Approval Manual (release manager) Automated (objective criteria)
Timeline 1-2 weeks 2-4 hours
Stage 3 approves Code quality only Code quality + production
Stage 9 approves Production deployment Automated validation
Release timing Business-driven Continuous
Feature control Optional Required (feature flags)
Testing requirements Standard Comprehensive
Risk mitigation Human judgment Automation + feature flags
Best for Regulated, high-risk Fast-moving, mature testing

Approval Decision Framework

Objective vs Subjective Criteria

Objective (measurable, automatable):

  • Test pass rate: 100%
  • Code coverage: ≥80%
  • Critical bugs: 0
  • Performance regression: <5%
  • Security vulnerabilities: 0 critical/high

Subjective (requires human judgment):

  • Business timing: Is now a good time?
  • Risk assessment: What's the business impact?
  • Stakeholder readiness: Are teams prepared?
  • Market conditions: Customer sentiment, competitive landscape

RA pattern: Uses both objective and subjective criteria

CDe pattern: Only objective criteria (subjective handled at Stage 3 or via feature flags)

Making the Go/No-Go Decision

RA Pattern decision tree:

1. Objective quality criteria met?
   - No → REJECT (fix issues)
   - Yes → Continue to 2

2. Documentation complete?
   - No → REJECT (complete documentation)
   - Yes → Continue to 3

3. Business timing acceptable?
   - No → DEFER (deploy later)
   - Yes → Continue to 4

4. Risk acceptable?
   - No → REJECT or DEFER (mitigate or delay)
   - Yes → APPROVE

CDe Pattern decision (automated):

1. All objective criteria met?
   - No → REJECT (automated block)
   - Yes → APPROVE (proceed automatically)

Organizational Considerations

Team Structure

RA Pattern:

  • Dedicated release manager role (or rotation)
  • Clear escalation path
  • Release committee (for high-risk changes)

CDe Pattern:

  • No dedicated release manager
  • Peer reviewers share responsibility
  • On-call team handles production issues

Communication

RA Pattern:

  • Formal approval communication (email, ticket)
  • Stakeholder notifications
  • Scheduled deployment windows
  • Change advisory board (if required)

CDe Pattern:

  • Automated notifications (Slack, email)
  • Continuous deployment announcements
  • No scheduled windows (deploy anytime)
  • Lightweight communication

Accountability

RA Pattern:

  • Release manager accountable for approval decision
  • Clear audit trail (who approved, when, why)
  • Documented decision-making

CDe Pattern:

  • Peer reviewer accountable for Stage 3 approval
  • Team collectively accountable for quality
  • Automated audit trail (quality gates passed)

Transitioning Between Patterns

RA → CDe (Building Maturity)

Phase 1: Build automated testing:

  • Increase unit test coverage (target ≥80%)
  • Add integration tests
  • Implement acceptance tests (IV, OV, PV)
  • Add performance tests

Phase 2: Implement feature flags:

  • Choose feature flag system
  • Integrate into application
  • Train team on flag usage
  • Practice gradual rollouts

Phase 3: Enhance monitoring:

  • Implement comprehensive metrics
  • Add automated alerting
  • Create dashboards
  • Practice rollback procedures

Phase 4: Pilot CDe on low-risk service:

  • Choose non-critical service
  • Implement automated Stage 9 approval
  • Monitor closely
  • Iterate based on learnings

Phase 5: Expand gradually:

  • Apply CDe to additional services
  • Refine automated criteria
  • Build team confidence
  • Eventually: all services on CDe

CDe → RA (Increasing Control)

Rare, but may happen when:

  • Entering regulated industry
  • High-profile incidents require more oversight
  • Organizational mandate for formal approval

Transition:

  • Implement release manager role
  • Add manual approval at Stage 9
  • Keep automated validation
  • Maintain feature flags (still valuable)

Best Practices Summary

RA Pattern:

  1. Clear approval criteria (document what "production ready" means)
  2. Timely approvals (< 24 hours SLA)
  3. Rotate release managers (spread knowledge, avoid bottleneck)
  4. Document decisions (why approved, why rejected)
  5. Continuous improvement (review what went wrong/right)

CDe Pattern:

  1. Comprehensive automated testing (can't fake quality)
  2. Feature flags required (decouple deployment from release)
  3. Robust monitoring (detect issues fast)
  4. Fast rollback (< 5 minutes)
  5. Team ownership (everyone responsible for production quality)

Both Patterns:

  1. Objective quality criteria (define thresholds)
  2. Complete documentation (before approval, not after)
  3. Risk assessment (identify what could go wrong)
  4. Rollback procedures (test before needing them)
  5. Continuous improvement (learn from deployments)